The installation of a new regenerative thermal oxidizer (RTO) and ducting at the Detroit Assembly Complex – Mack plant has seen significant progress this winter.
In accordance with the odor mitigation plan submitted last year, construction of an additional RTO is taking place outside the paint shop at Mack to ensure nuisance odors do not reach the neighboring community.
The plan calls for the exhaust from two existing stacks to be rerouted to the new system to destroy odor contributing compounds and route the concentrator treated air exhaust to the stack of the new RTO to improve dispersion through increased velocity and height.
The new RTO is expected to be operational by June 30.
©2024 Stellantis4Detroit All Rights Reserved.